The Rationale for Above-Surface Facilities
The redevelopment of the U.S. Amundsen-Scott South Pole Station�currently in the beginning phases of construction�will include the largest and most ambitious example of an elevated station...

Phase II Evaluation Findings
The Segmental Concrete Channel Bridge System
Prepared by the Highway Innovative Technology Evaluation Center (HITEC), a CERF Innovation Center. This report represents the second component of the...

Defining the Manual's Audience, Content, and Level of Detail
Often, the technical writers assigned to prepare an O&M manual aren't technical writers at all, but members of the facility design engineering staff. While they may...

Irrigation Method Selection Process
Intelligent selection of the irrigation method that best meets the goals and objectives of an irrigated agricultural development is of primary importance in the design process. A system...

Bangkok Blockbuster
When completed, the 54-kilometer Bang Na-Bang Pli-Bang Pakong Expressway in Bangkok, Thailand, will be the longest elevated expressway in the world. The precast segmental method is being...

Evaluation Findings for Dynamic Isolation Systems, Inc. Elastomeric Bearings
This report, Evaluation Findings for Dynamic Isolation Systems Elastometric Bearings, presents the results of a detailed evaluation for one...

Evaluation Findings for R.J. Watson Sliding Isolation Bearings
Prepared by the Highway Innovative Technology Evaluation Center (HITEC), a CERF Service Center. This report summarizes the results of a detailed evaluation...

Holding Court
Contractors had their work cut out for them when structural engineers specified concrete-filled steel tubes for the Thomas F. Eagleton Federal Courthouse's perimeter columns....

Cable Access
By moving the expansion joints off the main, cable-stayed span and creating innovative cable connections and tower configurations, Parsons Brinckerhoff Quade & Douglas Inc. (PB)...

Walled In (Available in Geoenvironmental Special Issue only)
Of the many challenging aspects of the $10.8 billion, 7.5 mi long Central Artery Project in Boston, the construction of soldier pile, tremie concrete (SPTC) walls under the existing elevated...

Substructures Stack Up (Available in Structural Engineering Special Issue only)
As part of a 1997 research project sponsored by the Texas Department of Transportation and the Federal Highway Administration, the University of Texas at Austin Center for Transportation...

Evaluation Findings for Enidine, Inc., Viscous Damper
Prepared by the Highway Innovative Technology Evaluation Center (HITEC), a CERF Service Center. This report summarizes the results of a detailed evaluation...

Evaluation Findings for Oiles Multiple Viscous Shear Damper (MS-DAMPER)
Prepared by the Highway Innovative Technology Evaluation Center (HITEC), a CERF Service Center. This report summarizes the results of a detailed evaluation...

Evaluation Findings for Taylor Devices Fluid Viscous Dampers
Prepared by the Highway Innovative Technology Evaluation Center (HITEC), a CERF Service Center. This report summarizes the results of a detailed evaluation...

Yesterday's Data�Tomorrow
Before the advent of computer-aided design (CAD) and geographic information systems (GIS), keeping documentation for future usage was no problem. All an engineer had to do was make sure...

Into the Fourth Dimension
A team of contractors designed a pharmaceutical plant entirely in 3-D CAD, then linked the renderings to a cost program and scheduling software, adding a fourth dimension�time�to the process....

The Warranty Alternative
State highway agencies are investigating such alternative contracting methods as warranties in reaction to decreased budgets and resources. The advantages to warranty contracting include...

Analysis, Design, Construction, and Testing of Deep Foundations
This proceedings, Analysis, Design, Construction, and Testing of Deep Foundations, consists of papers presented at the OTRC `99 Conference...

Metal Building Systems: A New Look
The use of metal building systems in low-rise, non-residential construction under 150,000 square feet has grown from less than 50 percent in 1986 to almost 70 percent today. Such systems...

Resolution Solutions
Disputes over such issues as change orders, extra work, delays, or defective work are an inescapable part of the construction process. By designing an effective dispute management program...

 

 

 

 

Return to search